The Anti-Dumping Commission has been renamed the Australian Trade Remedies Commission. The commission is now responsible for safeguard inquiries.
Read more about the changes.
The Anti-Dumping Commission has been renamed the Australian Trade Remedies Commission. The commission is now responsible for safeguard inquiries.
Read more about the changes.
Goods Covered by the Application
Certain electric resistance welded pipe and tube made of steel, comprising circular and non-circular hollow sections in galvanised and non-galvanised finishes, whether or not including alloys. The goods are normally referred to as either CHS (circular hollow sections) or RHS (rectangular or square hollow sections). The goods are collectively referred to as HSS (hollow structural sections). Finish types for the goods include pre-galvanised, hot-dipped galvanised (HDG), and non-galvanised HSS.Sizes of the goods are, for circular products, those exceeding 21 mm up to and including 165.1 mm in outside diameter and, for oval, square and rectangular products those with a perimeter up to and including 950.0 mm. CHS with other than plain ends (such as threaded, swaged and houldered) are also included within the goods coverage.
The following goods are excluded from the anti-dumping measures:
Further information on whether goods are included or excluded can be found in the initiation ADN (linked below).
| Case information | |||
|---|---|---|---|
| Applicant |
Orrcon Manufacturing Pty Ltd Austube Mills Pty Ltd |
Tariff Classification |
7306.30.00 (statistical codes 31,32,33,34,35,36,37) 7306.50.00 (statistical codes 45) 7306.61.00 (statistical codes 21,22,25,90,) 7306.69.00 (statistical codes 10) 7306.90.00 (statistical codes 12) |
| Investigation Period | 1 October 2018 to 30 September 2019 | Injury Examination Period | |
| Contacts for this investigation |
Case Manager: Tel: +61 3 8539 2424 |
Mailing address: | The Director - Investigations 1 Anti-Dumping Commission GPO Box 2013 Canberra ACT 2601 |
| Key Dates | ||||
|---|---|---|---|---|
| Initiation Date | 15 November 2019 | Initial submissions due | 22 December 2019 | |
| SEF* no later than | 20 May 2020 | SEF submissions due | 9 June 2020 | |
| Final recommendation due no later than | 4 July 2020 | Minister's decision expected | Within 30 days of receiving the recommendation | |
| *SEF - Statement of Essential Facts | ||||
| ADRP Review | ||||
| 2020/126 Review published on the ADRP website | ||||
| EPR number | Document type | Title | Date |
|---|---|---|---|
| 35 | Submission | ||
| 34 | File Note | ||
| 33 | Report | ||
| 32 | Note for File | ||
| 31 | Notice - TRN | ||
| 30 | Report | ||
| 29 | Submission | ||
| 28 | Submission | ||
| 27 | Submission | ||
| 26 | Submission | ||
| 25 | Submission | ||
| 24 | Report | ||
| 23 | Submission | ||
| 22 | Submission | ||
| 21 | Verification Report | ||
| 20 | Verification Report | ||
| 19 | Notice - TRN | ||
| 18 | Submission | ||
| 17 | Submission | ||
| 16 | Submission | ||
| 15 | Verification Report | ||
| 14 | Verification Report | ||
| 13 | Verification Report | ||
| 12 | Verification Report | ||
| 11 | Submission | ||
| 10 | Verification Report | ||
| 9 | Notice - TRN | ||
| 8 | Questionnaire | ||
| 7 | Briefing | ||
| 6 | Briefing | ||
| 5 | Questionnaire | ||
| 4 | Questionnaire | ||
| 3 | Notice - TRN | ||
| 2 | Application | ||
| 1 | Application |