Goods Covered by the Application
Certain electric resistance welded pipe and tube made of steel, comprising circular and non-circular hollow sections in galvanised and non-galvanised finishes, whether or not including alloys. The goods are normally referred to as either CHS (circular hollow sections) or RHS (rectangular or square hollow sections). The goods are collectively referred to as HSS (hollow structural sections). Finish types for the goods include pre-galvanised, hot-dipped galvanised (HDG), and non-galvanised HSS.
Sizes of the goods are, for circular products, those exceeding 21 mm up to and including 165.1 mm in outside diameter and, for oval, square and rectangular products those with a perimeter up to and including 950.0 mm. CHS with other than plain ends (such as threaded, swaged and shouldered) are also included within the goods coverage.
Goods excluded from this application include:
| Case information | |
|---|---|
| Case type | Investigation |
| Initiation date | 22 December 2015 |
| Applicant | Austube Mills Pty Ltd (ATM) |
| Tariff classification of the goodssubject to measures | 7306.30.00 (statistical codes 31, 32, 33, 34, 35, 36 and 37)7306.50.00 (statistical code 45) 7306.61.00 (statistical codes 21, 22, 25 and 90) 7306.69.00 (statistical code 10)7306.90.00 (statistical code 12) |
| Inquiry Period | 1 October 2014 to 30 September 2015 |
The public record EPR 320 includes non-confidential versions of the documents such as the application, submissions, questionnaire responses, Commission visit reports and letters.
| Event | Date | Status |
|---|---|---|
| Initial submissions due | 28 January 2016 | Open |
| Preliminary Affirmative Determination (earliest date) | 20 February 2016 | Made |
| Statement of Essential Facts due | 9 June 2016 | Published |
| Final recommendation to the Parliamentary Secretary no later than | 24 July 2016 | Terminated |
| ADN - Resumption of an Investigation | 15 March 2017 | Published |
| Submissions in response to the resumption of the investigation | 10 April 2017 | Closed |
| Statement of Essential Facts for Resumed Investigation due | 15 August 2017 | Published |
| Submissions to SEF due | 4 September 2017 | |
| Final Recommendation to the Parliamentary Secretary no later than | 29 September 2017 | |
| Parliamentary Secretary's decision expected | Within 30 days of receiving the recommendation |
Exporter Questionnaire (DOCX 173KB)
Exporter Questionnaire Spreadsheet (XLSX 53KB)
Case Manager: +61 2 6102 9050
Email: investigations4@adcommission.gov.au
Mailing address:The Director
Operations 4
Anti-Dumping Commission
GPO Box 2013
Canberra ACT 2601
| EPR number | Document type | Title | Date |
|---|---|---|---|
| 70 | Notice - TRN | ||
| 69 | Report | ||
| 68 | Submission | ||
| 67 | Submission | ||
| 66 | Submission | ||
| 65 | Report | ||
| 64 | Questionnaire | ||
| 63 | Submission | ||
| 62 | Submission | ||
| 61 | Submission | ||
| 60 | Submission | ||
| 59 | Submission | ||
| 58 | Submission | ||
| 57 | Submission | ||
| 56 | Submission | ||
| 55 | Notice - TRN | ||
| 54 | Notice - TRN | ||
| 53 | Report | ||
| 52 | Submission | ||
| 51 | Submission | ||
| 50 | Submission | ||
| 49 | Submission | ||
| 48 | Submission | ||
| 47 | Submission | ||
| 46 | Submission | ||
| 45 | Submission | ||
| 44 | Submission | ||
| 43 | Submission | ||
| 42 | Submission | ||
| 41 | Submission | ||
| 40 | Submission | ||
| 39 | Report | ||
| 38 | Verification Report | ||
| 37 | Verification Report | ||
| 36 | Verification Report | ||
| 35 | Submission | ||
| 34 | Submission | ||
| 33 | Verification Report | ||
| 32 | Submission | ||
| 31 | Submission | ||
| 30 | Verification Report | ||
| 29 | Verification Report | ||
| 28 | Submission | ||
| 27 | Verification Report | ||
| 26 | Verification Report | ||
| 25 | Submission | ||
| 24 | Verification Report | ||
| 23 | Notice - TRN | ||
| 22 | Submission | ||
| 21 | Submission | ||
| 20 | Submission | ||
| 19 | Submission | ||
| 18 | Submission | ||
| 17 | Submission | ||
| 16 | Notice - TRN | ||
| 15 | Questionnaire | ||
| 14 | Letter | ||
| 13 | Questionnaire | ||
| 12 | Questionnaire | ||
| 11 | Questionnaire | ||
| 10 | Questionnaire | ||
| 9 | Questionnaire | ||
| 8 | Questionnaire | ||
| 7 | Submission | ||
| 6 | Submission | ||
| 5 | Submission | ||
| 4 | Submission | ||
| 3 | Notice - TRN | ||
| 2 | Report | ||
| 1 | Application |