The goods the subject of the application (the goods) are:
Light gauge steel stud and track, metallic coated, whether or not containing alloys, with a profile of up to and including 170 millimetres in width by 170 millimetres in height, and with a base metal thickness of up to and including 0.69 millimetres.
Further information
LGST are framing components used to support internal non-load-bearing building walls and partitions. A LGST is a cold-formed product, further worked from either zinc coated (galvanised) steel or aluminium zinc coated steel as the raw material (including all variants thereof, for example whether or not containing magnesium or other alloys). LGST comprise both the vertical (stud) and horizontal (track) components.
Steel framing components are categorised by gauge (thickness) and usage, being either:
- LGST, as non-structural light gauge products (common in ‘drywall’ applications); or
- structural (medium and heavy gauge) steel framing members (common in high-rise buildings and exterior walling).
This application covers LGST, of varying steel grades, and whether or not including service holes.
Exclusions
Medium and heavy gauge steel stud and track, noggings, and ‘flexible’ track components are excluded from this application
The goods are generally, but not exclusively, classified to the following tariff subheadings of Schedule 3 to the Customs Tariff Act 1995:1
Further information on the goods, including exclusions, can be found in the ADN below.
Case information |
|||
Applicant |
Rondo Building Services Pty Ltd |
Tariff Classification (Statistical Code) |
7216.61.00 (57) 7216.69.00 (58) 7308.90.00 (52, 53, 55, 56) |
Investigation Period |
1 April 2024 to 31 March 2025 |
Injury Examination Period |
From 1 April 2021 |
Contacts for this investigation |
Case Manager Tel: +61 2 6213 6000 |
Mailing address: |
Investigations |
Key Dates |
|||
Initiation Date |
30 June 2025 |
Initial submissions due |
6 August 2025 |
PAD* earliest date |
Day 60 after initiation |
29 August 2025 |
|
Proposals to modify the proposed MCC structure due no later than |
6 August 2025 |
||
SEF** no later than |
20 October 2025 |
SEF submissions due |
20 days after publication of SEF |
Final recommendation due no later than |
2 December 2025 |
Minister's decision expected |
Within 30 days of receiving the recommendation |
*PAD - Preliminary Affirmative Determination **SEF - Statement of Essential Facts |
Questionnaires |
||
Exporter* |
||
Importer** |
||
*Lodgement of Exporter questionnaire is due by: 6 August 2025, please refer to ADN 2025/053 for more details. |
||
**Lodgement of Importer questionnaire is due by: Part A: 7 July 2025, and Parts B–E: 28 July 2025 |